I have a multi-step Zap that invokes a Sub-Zap at one step. While editing and testing the Zap, I choose the test data and then I am stepping into each step and testing it (or hitting Continue). When I hit the Sub-Zap step and run “Test step” in order to send the values and get the response, it uses whatever data was last used to test the Sub-Zap rather than the data I chose as test data for the Zap trigger step. This isn’t what I want, of course.
I found that if I then edit the Sub-Zap and on the first step I choose “Find new records” for testing, I will then see the data from the “test” I ran in the calling Zap’s Sub-Zap step. Then when I return to the calling Zap edit window and re-run the test on the Sub-Zap step, it uses the Zap’s test data as expected.
I consider this a kludgy workaround, as I don't actually need to edit the Sub-Zap, but must do so in order to edit and test the calling Zap, leaving behind a draft edit that I don’t really care about.
Is this something I could submit as a feature request? Anyone else have any insight?




