I have a Zap that follows the following steps…

  1. Ninja Forms - New Form Submission in Ninja Forms
  2. Google Sheets - Create Spreadsheet Row in Google Sheets
  3. Only continue if… Design Drawing File Upload from Ninja Form EXISTS
  4. Google Drive - Upload File in Google Drive (pulls from the file uploaded in Ninja Form

What I need to do next is have the most recent row added to the google sheet updated in the Drawing Files column with Alternate Link from Google Drive for the file that was uploaded. 

In other words if step #3 is True, then the Drawing File from Ninja Forms would be replaced with the Drawing File uploaded to the Google Drive Folder.

Hi @Dietz Group 

Good question.

Try adding this Zap step: GSheets - Update Row