Hi, I need help trying to create a ZAP that will calculate and complete a specific date based on another date field.
What I would like is a date field on a DEAL in Pipedrive to be filled automatically with a date 10 days prior to the reference date field, calculating this date automatically.
Example:
Date field Reference: 10-Jan-2023 (to be filled manually)
Date field to be completed: will be automatically filled with “01-Jan-2023” calculated by the system.